This part of the layout is the focus at present. The final plaster cloth has been applied and received a coating of Hydrocal and paint. The ground cover is on site and the trees and brush have been ordered. Ballast is available but first there are at least 2 problem joints on the down grade track in the corner.
Worst case scenario evolved and I had to rip up the track and road bed and relay. Shoot me now, please. I have also considered replacing the flex track with Bachmann E-Z track as they have nominal 36 and 33 inch radius available. So far so good so the code 83 flex stays.


