Curve rebuilding has expanded into a major rebuild of the upper deck.  Leveling sub-deck, relaying road bead and track, realigning curves, etc.  It out of control.

The angled section is the new approach to the south end loop.  The straight section with the brick is the old version.  It will be a grain silo.

The upper yard is gone (a new one being built on the lower expansion) and the railroad has been realigned.  Mountains will be installed along here connecting to those already in place along the north end.